Hot sale good quality Chromium Carbide Coated Ball sale to South Korea

Hot sale good quality Chromium Carbide Coated Ball sale to South Korea

INQUIRY DETAILS *

INQUIRY NOW
  • captcha

Product Detail

FAQ

Product Tags

Our company since its inception, always regards product quality as enterprise life, continuously improve production technology, improve product quality and continuously strengthen enterprise total quality management, in strict accordance with the national standard ISO 9001:2000 Hot sale good quality Chromium Carbide Coated Ball sale to South Korea, We fully welcome customers from all over the world to establish stable and mutually beneficial business relationships, to have a bright future together.


Product Name: Steel ball for ball valves, Valve Sphere

Product Type: trunnion ball, floating ball, spigot mounted, stem ball, three way ball, segmented ball, V type ball,

Size Range:

Ball for floating ball valve: NPS 1- 10 Inches

Ball for trunnion ball valve: NPS 1- 60 Inches

Pressure Rating: ANSI 150~2500Lbs, JIS 5K~30K, PN16~420

Sphericity:

ØNPS 1- 12 Inches: Minimum 20 micron (ìm )

ØNPS 12- 60 Inches: Minimum 30 micron (ìm )

Product Standard: ANSI, UNI, DIN, JIS, EN. or as customers’ drawings

Base Materials:

ØCarbon Steel: ASTM A105,ASTM A350 LF2 LF3,LC1,LC2,LC3,

ØStainless Steel: ASTM A182 F304,F304L,F316,F316L,F317,F317L,F321,F51,F53,F6a/AISI 410,420

ØAlloy Steel: A564 630(17-4PH), Monel, Inconel…

ØBrass/Bronze: UNS C37700, UNS C92200, UNS C83600, UNS C84800…

Surface Coating:

ØENP ,

ØChrome Plating,

ØTungsten Carbide,

ØChrome Carbide,

ØStellite,

ØInconel

A.E.A manufactures single balls or kit Seats and Ball from 1/2 up to 60 Inches.

  • Previous:
  • Next:
  • FAQ Content




  • A video on changing a bathtub spud. Can be a simple process, but the odd little problem may arise. A few tips to help in the procedure.



    So here we are the gas was shut off because there was a gastite fitting that was loose, someone didnt tighten it enough. The gas company is currently running new lines in the front street and will replace all of this in three weeks. They wanted me to install valves with locks after the meter, just so they can tear it out in 3 weeks. this is what i did.

    Related Products

    INQUIRY DETAILS *

    INQUIRY NOW
    • captcha